SKYDECK in action
-
Watch the video to find out more
-
Effortless working
Through very light and easy-to-handle components
Project: Frankley WTW
-
Fast forming
Is possible due to few components and a simple and systematic assembly sequence
Project: South Quay Plaza
-
Lower number of on-site materials
Thanks to early striking with the drophead and fast deployment of the panels and beams for the next cycle
Project: Hollis Croft
-
Easy cleaning and maintenance
Performance is maintaned year after year through powder-coated elements and undercut panel edges for easy cleaning
Project: Park Drive
Product Data Sheet
System type
Panel Slab Formwork
Area/Support
3.45 m²
Material
Aluminum
Formlining
9 mm FinPly
Installation time
Early stripping is possible after just one day thanks to a drop head. The formwork is lowered by 60 mm with a hammer blow.
Anti-corrosion and surface coating
Powder coating
Fulfilled standard
DIN 18202, line 7 with a ceiling thickness of 95 cm
Slab thickness
Up to 109 cm in any height
Load
Permissible platform load: 150kg/m²
Other
Quick and easy choice of support using table book, systematic assembly sequence and assembly safety
Interested in using SKYDECK for your project?
Call us on + 60 (03) 7969 1088 to discuss your requirements further.