Bayan Lepas Expressway, Penang

Project data

Location: Penang, Malaysia

Bayan Lepas Expressway is a coastal expressway that connects the Penang Bridge to George Town.

Requirements

  • to construct 12m long hammerhead poured in 3 steps
  • delivery of the formwork solution in a very short amount of time

Customer

WZS KenKeong Sdn Bhd

Customer's benefit

  • Assembly on the construction site was carried out in the shortest possible time
  • Shuttering and striking as well as moving from cycle to cycle with only 6 men
  • Planned 10-day cycle maintained
  • Extremely cost-effective through the use of rentable VARIOKIT system components
Mr. Chin Sau Lun
Senior Engineer

The PERI systems are well easy to understand and designed to meet individual requirements - no problem whatsoever for our construction team.  As a result, we could maintain the tight construction schedule as well as meeting strict safety requirements.

PERI solution

The VARIOKIT construction equipment demonstrated its great flexibilities during the forming of the 12m long hammerhead at Pier 19 and Pier 20.