Bypass tunnel Sochi, Russian Federation
Project data
- length tunnel: 2.6 km
- width/height of cross-section: 10.80 m / 7.95 m
- structure: mining technique
Requirements
Fabrication of six emergency stop bays arranged alternately, with a length of 54 m each
- widening by 3.50 m to 14.30 m
- decrease of the outer dimensions for the forward movement to the next place of utilisation
Customer
OOO Tonneldorstroy, Sochi
Customer's benefit
- load-bearing tunnel formwork carriage with flexible design
- fast and safe striking and moving process
Alexey Boldyirew | Sergey Haladji
Deputy Construction Manager | Foreman
At the beginning, we were rather sceptical concerning the filigree structure. Our trust has been growing by the day – now we are absolutely thrilled. The PERI formwork carriage is extremely stable and very suitable for our daily work, it fulfils all requirements of our jobsite.
PERI solution
- VARIOKIT tunnel formwork carriage with hydraulically foldable side formwork and a lowering range of 1 m
- each emergency stop bay in 6 sections with a length of 9 m each
- exactly defined working sequences
- hydraulic operation
- utilisation of the PERI concrete pump connection