Circular Tank Titiwangsa Kuala Lumpur

Project data

Location: Kuala Lumpur, Malaysia

The station is located besides Jalan Tun Razak and is an interchange station with both the LRT Ampang Line and KL Monorail Line.  Expected to complete and start operation in 2022.

Requirements

To have a working platform for welding, leak test and welding strenght test.

Customer

Hoa Fei Engineering Construction Sdn Bhd

Customer's benefit

  • Fall Protection provided by the guardrail mounted in advance give a safe working platform
  • Fast assembly take place virtually with minimum use of tools
Mr. Lee Yan Cheong
Superintendent

As expected, PERI team has provided us with very professional support. We have chosen the right formwork system due to the high level of safety, easy handling and fast cycle sequence.

PERI solution

Circular Facade Scaffold