"Humboldt Forum" City Palace Berlin, Germany
Project data
Location: Berlin, Germany
- Reconstruction of the Berlin City Palace on Spree Island, for the most part according to the old plans
- 180 m long, 120 m wide and 35 m high outer shell as well as a 70 m high cupola roof in the historical Baroque style
- Under the auspices of the Humboldt Forum, Berlin´s new landmark will exhibit international collections and science-historical works; in addition, a section of the Central and Regional Library will also find a home here.
Requirements
- Circular reinforced concrete walls of the cupola
- Provision of large quantities of formwork and scaffolding materials
- Tight construction schedule
- Large slab heights
- Safe transfer of high loads
- Working operations without facade scaffolding
Customer
Contractor
Hochtief Building GmbH, Rohbau/Industriebau Berlin
Field Service
PERI Berlin
Customer's benefit
- Fulfillment of all requirements and maintaining the tight construction schedule through on-site project support provided by PERI engineers
- Short shuttering and moving times
- Accelerated construction progress due to the provision of project-specific pre-assembled special formwork
- Maximum cost security for the project management due to the pre-defined fixed prices for the customised special formwork
- Considerable time savings in all shuttering and striking operations due to the one-sided MX tie technology
- Moving of the QUATTRO Column Formwork as complete units using only one crane lift each time
- Due to the use of external CB Climbing Platforms, no facade scaffolding was required for the shell construction
Bernd Dommack
Senior Site Manager
I rate the PERI contribution very highly. All requirements were completely fulfilled and the tight construction schedule was also maintained. In addition to the fast shuttering and moving times with MAXIMO and SKYDECK, I would like to especially praise the on-site project support along with the flexible, operative and process-oriented cooperation with the PERI engineers.
PERI solution
- Cost-effective formwork and scaffolding solutions from one source
- Full consideration of all construction tasks
- Well thought-out safety technology
- Accurate and detailed planning, assembly und on-time delivery of project-specific special formwork
- Provision of modern and time-saving systems
- Punctual delivery of over 6,000 m² MAXIMO Panel Formwork and a total of 10,000 m² SKYDECK Slab Formwork