You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Bypass tunnel Sochi, Russian Federation

Project data

  • length tunnel: 2.6 km
  • width/height of cross-section: 10.80 m / 7.95 m
  • structure: mining technique

Requirements

Fabrication of six emergency stop bays arranged alternately, with a length of 54 m each

  • widening by 3.50 m to 14.30 m
  • decrease of the outer dimensions for the forward movement to the next place of utilisation

Customer

OOO Tonneldorstroy, Sochi

Customer's benefit

  • load-bearing tunnel formwork carriage with flexible design
  • fast and safe striking and moving process
Alexey Boldyirew, Deputy Construction Manager | Sergey Haladji, Foreman
Alexey Boldyirew | Sergey Haladji
Deputy Construction Manager | Foreman

At the beginning, we were rather sceptical concerning the filigree structure. Our trust has been growing by the day – now we are absolutely thrilled. The PERI formwork carriage is extremely stable and very suitable for our daily work, it fulfils all requirements of our jobsite.

PERI solution

  • VARIOKIT tunnel formwork carriage with hydraulically foldable side formwork and a lowering range of 1 m
  • each emergency stop bay in 6 sections with a length of 9 m each
  • exactly defined working sequences
  • hydraulic operation
  • utilisation of the PERI concrete pump connection