KVMRT Cochrane Station, Kuala Lumpur

Project data

Location: Kuala Lumpur, Malaysia

The Cochrane MRT Station is one of the biggest underground stations with an excavation depth of 32m below ground and it is located in Kuala Lumpur limestone formation (nestled within Bulatan Pandan and Jalan Peel, Kuala Lumpur).  This station also serves as launching shaft for the tunnel boring machines from both ends of the station. 

Requirements

  • To meet the challenges of working underground in confined spaces.
  • The single sided wall was constructed in 1 casting of up to 8.40 m height with 30m length.

Customer

Civil Tech Sdn Bhd

Customer's benefit

  • The construction crew could concrete each section according to the planned schedule thanks to the flexible and user-friendly design.
  • Due to the high percentage of the rentable system components, the formwork solution is also very cost-effective which enables the site to stay within their budget.
Mr. Chan Kwong Thai
Project Manager

The high safety levels and speed of the PERI systems really impressed me.  Already after the first climbing phase, we knew that our decision to use PERI was spot on.  On such a large construction site, it is very important to work together with a competent formwork provider.  With PERI, we definitely had the right partner.

PERI solution

  • PERI engineers together with the site management designed a customised project solution to suite all geometric changes on the bais of our VARIOKIT system components and ST 100 shoring towers.
  • The client demanded a design solution whereby little space was available in those areas.