Ritz Carlton Suite, Kuala Lumpur

Project data

Location: Kuala Lumpur, Malaysia

With 2 blocks of 46 stories and a 3 level basement car park, this impressive residence and office tower, is another construction highlight besides the Concorde Hotel and opposite Renaissance Hotel in Kuala Lumpur.

Requirements

  • To provide a formwork solution that enabled the contractor to fulfill the high requirements as well as the tight contruction schedule.

Customer

Vinci Construction Grands Projets

Customer's benefit

PERI system is flexible and easy to use.
PERI provide good technical support and a reliabe material supply.
 

Mr. Seah Kok Siang
Senior Project Co-ordinator

This is my first time using PERI systems and I am impressed by how easy it is to deploy them.  This is obviously important on such a vast site where efficiencies count.  Most workers have used PERI Formwork before and were specifically chosen because of the compliance with the IBS.

PERI solution

  • Using VARIO GT 24 system in combination with the CB 160 / CB 240 and internal shaft climbing technology for the corewalls.
  • For constructing the high-floor height of slabs at the podium area and tunnel access, the PD 8 Towers or ST 100 Stacking Tower Frames were used.