Location: Kota Damansara, Malaysia

The DASH highway is a 20.1 km, three-lane, dual carriageway expressway that will start at the Puncak Perdana, Shah Alam intersection and is expected to cover Shah Alam, Subang, Kota Damansara and Damansara areas.

Requirements

The project required a fast shoring solution that is able to cater for a single portal beam cast of 3.4m (H) and a slped soffit at 15m (H).

Customer

MRCB Builders Sdn Bhd 

Customer's benefit

  • Efficient installation with its high load capcity
  • Even with the required technical revision during site installation, the site was able to erect and brace 60 nos of 15m ST100 within 12 days.
Encik Farhan Nizar
Senior Coordinator (Lian Fatt Trading Sdn Bhd)

PERI system was the first in mind for my hugh portal.  The simplicity of the design will not go wrong and extra secured.  Besides, by assigning experienced Instructor into the job, it is vital to east the work sequence.  Appointing PERI for this job will be hassle-free.

PERI solution

  • Cost-effective formwork solution with efficient use of system formwork
  • Continuous monitoring of construction measures and quality assurance on site
  • Reduction of construction time