Eemshaven Power Plant, Netherlands
Project data
Location: Eemshaven, Netherlands
Highly efficient coal-fired power station complete with a switchable biomass combustion facility with 1,600 MW capacity
- 64 m long and 35 m high electric filters for flue gas desulphurisation
- 4-year construction period, operational in 2014
Requirements
- Working scaffold for welding and insulation work
- Realisation of working platforms in accordance with the highest quality standards
Customer
Bilfinger Industrial Services Polska Sp. z o. o., Warsaw
Customer's benefit
- High level of working safety for scaffold assembly and use
- Good accessibility with a minimum of material utilisation
Daniel Kuceł
Site Manager
The collaboration with PERI is highly satisfactory for both Bilfinger as well as our client, and we have been able to meet all of the deadlines. For me, PERI UP stands for quality and ergonomics, not least due to the fact that the PERI UP scaffold construction could be optimally adapted to ensure safe execution of the sound-proofing work.
PERI solution
- Working platforms and access means on the basis of adaptable PERI UP Flex modular scaffolding
- Dividable scaffold bays as required for generous dimensioning with 3 m bays as the basis and optimal geometrical adjustments in 25 cm increments in the area of the components involved
- Facade-side working scaffold using modular scaffolding with a guardrail in advance assembly