KVMRT Package V8, Kajang

Project data

Location: Kajang, Malaysia

Package V8 starts from Taman Mesra and ends at Kajang Station (4.6 km main line); It includes 1.8 km spur line of southbound and northbound single track spur line viaduct to the proposed Kajang Depot. There are 3 elevated stations along this package namely Sungai Kantan, Bandar Kajang and Kajang Stations.

Requirements

  • One of the major challenges faced by the contractor was to ensure public safety during the tight constrution schedule.
  • To meet the requirement for safety and cost effectiveness.

Customer

UEM Construction Sdn Bhd

Customer's benefit

  • The entire PERI solution has been supplied on rental basis and has therefore ensured to UEM to stay within the budget.
  • The dense PERI UP shoring could support the designed load of a span of 6m.
Encik Jazlan bin Salleh
Project Manager

We are extremely statisfied with the PERI systems and the very efficient engineering.  Cycles could be greatly accelerated with the help of the PERI UP and VARIOKIT.  In spite of the great heights, operations could be carried out safely on the working platforms.  In addition, we achieved excellent concrete surfaces and our client is very satisfied.

Encik Mohd Kamal Musa
Construction Manager

There are many shoring systems and also a lot of working scaffold on the market. But PERI UP is the only system which equally satisfies both aspects.  In particular, the high load bearing capacity impressed me.

PERI solution

  • The PERI UP system scaffolding was used in combination with the ST 100 and SB Brace Frames.
  • The piers were build with the flexible VARIO girder formwork on safe CB 240 climbing brackets
  • PERI UP shoring in the combination with custom made-units for the round shaped part