KVMRT Package V8
Kajang, Malaysia

Package V8 starts from Taman Mesra and ends at Kajang Station (4.6 km main line); It includes 1.8 km spur line of southbound and northbound single track spur line viaduct to the proposed Kajang Depot. There are 3 elevated stations along this package namely Sungai Kantan, Bandar Kajang and Kajang Stations.

 

 

Location
Main Application
Infrastructure
Project participants
Customer: UEM Construction Sdn Bhd

The Project

Project Information

from left to right
Encik Jazlan bin Salleh
Project Manager
Encik Mohd Kamal Musa
Construction Manager
We are extremely statisfied with the PERI systems and the very efficient engineering. Cycles could be greatly accelerated with the help of the PERI UP and VARIOKIT. In spite of the great heights, operations could be carried out safely on the working platforms. In addition, we achieved excellent concrete surfaces and our client is very satisfied.

There are many shoring systems and also a lot of working scaffold on the market. But PERI UP is the only system which equally satisfies both aspects. In particular, the high load bearing capacity impressed me.