Project data

Location: Kuala Lumpur, Malaysia

The Tun Razak Exchange (TRX)  Mass Rapid Transport (MRT) station is the biggest among the seven underground MRT stations with 45m depth along the SBK route which will later be extended to Serdang and Putrajaya (MRT Two Route). 

Requirements

  • Starting with the modular SB frame system for pouring the single sided walls (Extended height) 12.2m x 2.1m height.  PERI has supplied the vast majority of temporary works structures on TRX. Casting area : 25.62 sqm completed with stop end panel
  • SB Frame A,B,C 12.2m x 6.6m casting height 80.52 sqm.
  • ST100 intermediate/suspended formwork systems
  • For floor height up to 6.6m
  • Approx casting height 510.00 sqm complete with shoring system internal support precast element, girder.

Customer

MMC Gamuda KVMR (T) Sdn Bhd
IDE-Totalap Joint Venture

Customer's benefit

  • adherence to required construction time through material provision for the complete length
  • time advantages due to detailed implementation planning and simple erection
Mr. Foong Soon Seng
Senior Engineer

With the PERI systems, we were able to achieve fast and safe cycle sequences.  The products are simple to operate and can be used very flexibly.  In addition, PERI provided us with the required technical support on the contruction site.

PERI solution

  • short-term delivery and provision of complete formwork material
  • detailed implementation planning
  • PERI supervisor