Lanaye Lock Bridge, Belgium

Project data

Location: Lanaye, Belgium

Steel composite bridge over the Lanaye lock facility, length 200 m, width 15 m

Requirements

  • Cantilever formwork with 4.50 m cantilever length
  • Tight bend radii on area over the river banks (axis radius 27.50 m)

Customer

BESIX, Brussels

Customer's benefit

  • Cost-effective project solution through the use of rentable system components in combination with project-specific adjustments
  • Maintaining a tight construction schedule
  • Rapid final assembly and therefore fast on-site availability thanks to pre-assembled formwork elements
Lanaye Lock Bridge: Pedro de Guia, Technical Manager
Pedro de Guia
Technical Manager

Due to our positive experience with similar projects, we decided once again in favour of PERI. Their technical support within the framework of the tight schedule as well as the project solution using the formwork carriage and cantilever brackets have confirmed our decision.

PERI solution

  • two VARIOKIT steel composite formwork carriages for the main bridge with 13 casting segments using the back-step construction method
  • VARIOKIT cantilever bracket units in the tight bend areas
  • Project-specific special solution pressure supports on the circular piers for cantilevering on the external side
     