MRT Package V201

Project data

Location: Kuala Lumpur, Malaysia

Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) has awarded the viaduct work package V201 for the construction of the MRT Sungai Buloh-Serdang-Putrajaya (SSP) line to Sunway Construction Sdn Bhd.
 

Requirements

to provide a comprehensive and detailed engineering solution to cater 2.5m concrete casting for portals.

Customer

Sunway Construction Sdn Bhd

Customer's benefit

  • Cost-effective and practical complete solution from one source
  • Realization of the required concrete surfaces
  • Reliable support for workload and cost planning through continuous, close cooperation with PERI
  • Easy and simple on-site assembly along with fast shuttering and striking of the customized steel formwork for the load-bearing Y-shaped piers
  • Safe working scaffold and access points at all heights and on all working areas, fast and safe assembly of PERI scaffolding technology

PERI solution

PERI VARIOKIT was devised to serve as a support over mansoon drain on top of which combination of PERI UP.  PERI ST100 was used as shoring to support soffit formwork and Vario Wall formwork. At two cantilever sides, SB Frame and CB240 were used as casting and working platform. 

This system was designed in a safe and economical manner so that all standard items could be assembled on the ground and lifted to the position.