You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

PPA1M, Putrajaya

Project data

Location: Putrajaya, Malaysia

Located at Precinct 5 Putrajaya, a total of 100,000 houses will be built under 1Malaysia Civil Servants' Housing Programme (PPA1M) nationwide.  The first phase of the PPA1M programme involving the construction of 10,366 houses was launched in April 2015. 

Requirements

DUO was chosen to enhance the efficiency, flexibility, speed and cost saving.

Customer

Pembinaan Mitrajaya Sdn Bhd

Customer's benefit

Able to reduce the execution time and staff requirement

Mr. Ng Kong Huei
Project Director

DUO system rationalises the processes on the construction site and we were able to reduce the execution time as well as staff requirement.  DUO can be cleaned easily because the concrete hardly sticks to the formlining.  We are satisfied with the concrete surface results too.

PERI solution

With the integration of the DUO for the walls and columns, PERI TK Tables and PERI UP for the slabs, can be safely shuttered from the installation level. The panels are hooked in from below and pushed upwards by means of the shuttering aid.  As the panel size determines the position of the slab props meansuring is not necessary.

PERI systems in use