The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes

Infrastructure

Where smart engineering meets digital expertise

For over 30 years, we’ve been involved in delivering some of the Malaysia’s most complex roads, tunnels and bridges. By using modern technology alongside our trusted temporary works systems, we help you deliver infrastructure that is built to last.

Focus Project

Our Infrastructure Projects

Penang Second Crossing Bridge
Tun Sardon Link, Penang
Dash Highway Package CB2 (Portal P129)
KVMRT Package V206, Serdang Raya
MRT Line 2 Kampung Pandan Roundabout Intervention Shaft 2 and 3
MRT Package V201
PERI Form Traveler - Balanced Cantilever Solution
TRX Infrastructure & Roadway Works
KVMRT2 Bandar Malaysia Station
Circular tank cost-effectively climbed and reliably sealed
Circular Tank Titiwangsa, Kuala Lumpur
You can reply on PERI
Intervention Shaft 2, Kuala Lumpur