Rapid Substation Package 14 Cooling Water 4720 Pengerang

Project data

Location: Pengerang, Johor, Malaysia

RAPID substation package 14 has more than 20 substations.

Requirements

  • to provide PERI UP shoring for cooling tower structure and facade work.
  • to provide the facade for the rebar installation and concrete casting
  • facade need to be free standing as it cannot be anchor to the wall
  • to provide VARIO wall formwork for cooling tank

Customer

TCC

Customer's benefit

Grid system of 25cm and 50cm enable the entire facade scaffold to be connected.
Modular scaffold as shoring for the tower

Site Construction Team
Site Engineer

The PERI construction fulfilled all our needs. We had absolutely no problems from the planning stage through to the final assembly. 

PERI solution

Facade Solution