Project data

Location: Kuala Lumpur, Malaysia

The 1.5 million sq.ft. development consist of over 300,000 sq.ft. of luxury retail space, with more than 230 hotel rooms, as well as hotel service apartments and residences. This development will be a new landmark located in Kuala Lumpur City Centre

Requirements

  • compliance with a very tight construction schedule
  • high level of safety for construction operations

Customer

CRCC Malaysia Bhd

Customer's benefit

The shoring solutions were completely with the formwork systems which facilititated on optimized transfer of loads.
Interface problems were kept to an absolute minimum, errors in the execution were avoided and productivity was maximized.

Ma Zhan Jiang
Project Manager

PERI complied with our requests right from our very first meeting. The comprehensive support-planning, static, logistics through to the on-site service also had a very positve impact on the project. 

PERI solution

  • PERI engineers combined PERI UP, ST100 shoring and the RCS  climbing protection panel to create an efficient formwork solution with a very high level of safety.
  • The PERI UP shoring system was adapted to support the deep concrete beams with width of 3.50m pouring depth as well as the height of 26m of the birdcage.