Traffic junction Siekierkowska roadway, Poland

Project data

Location: Warsaw, Poland

Access roads with lengths of 723 m and 419 m for the intersection-free routing of the Siekierkowska roadway on the southern ring road at the traffic junction Bora Komorowskiego over 3 levels.

Requirements

  • fabrication of the pillars, the bulkheads and the bridge superstructure
  • 6 pouring sections with a length of about 50 m each, simultaneously

Customer

Budimex-Dromex S.A., Warsaw

Customer's benefit

  • fast moving of formwork and shoring
  • fast construction progress
Siekierkowska junction - Wlodzimierz Bielski, Site Manager
Wlodzimierz Bielski
Bauleiter

We were able to anchor the PERI formwork units at the bridge during striking to be able to dismantle the shoring. This helped us to save very much time and a lot of labour costs. Because especially on inner-city jobsites, fast moving of the formwork is of particular importance.

PERI solution

  • formwork units based on rentable standard parts for the shuttering of the box girder cross-section
  • fastening at the bridge structure with DW 15 ties for fast moving of the shoring