Tun Sardon Link, Penang

Project data

Location: Penang, Malaysia

The Tun Sardon Link Bridge will start from Lebuhraya Thean Tek and end at Lebuh Bukit Jambul, is expected to complete by end of this year.   The construction of the bridge involves piers of 40m in height and a total length of the viaduct of 520m. The PERI Malaysia Team provided an economical and effective solution by designing and supplying 4 sets of Form Travelers together with PD8 shoring for the piers with safety as our top priority which resulted in the project team completing all elements ahead of the project schedule.   This alternative road is intended to ease traffic congestion along Jalan Paya Terubong, which is an arterial road linking Bayan Baru, Balik Pulau and Air Item, Penang.

 

 

Requirements

  • Long span crossing construction with free balanced cantilever method.
  • Short cycle time in segmental box girder casting.
  • Component's weight control due to constrain in crane lifting capacity.

Customer

Yuta Maju Sdn Bhd

Customer's benefit

  • Cost effective solutions for cast-in-situ balanced cantilever box girder segment bridge.
  • System is lightweight and equipped with hydraulics to ease operation.
  • Easily achieved a weekly cycle with minimum labour.
  • Reliable Partner

PERI solution

  • Form Traveler - Long Span Construction
  • PD8 Shoring System - Span between Pier 3,  Pier 4 and End Span
  • RCS Self Climbing System  Pier Column
  • CB240 Climbing System - Pier Column
  • PERI UP Shoring System - Hammerhead P2
  • SB Frame and Variokit for Hammerhead P1, P5 and P6